Other Services
SERVICES · OTHER SERVICES
Other services
Specialist access, temporary works and support solutions beyond standard scaffolding, including weather protection, suspended access, material handling, structural support, waste systems, fencing and temporary site access.
Specialist solutions
Temporary works, access and support systems
Some projects need more than a standard scaffold package. We support industrial, commercial and infrastructure works with specialist systems designed for access, protection, handling, support and site control. Each solution is selected to match the site constraints, programme and loading requirements of the job.

Material handling
Material elevators
Material elevators provide safe and efficient vertical transport of tools, materials and equipment across multiple working levels on site.
They reduce manual handling, improve movement of supplies between trades and help keep the project moving by supporting faster on-site logistics.
Systems can be selected around the building height, load capacity, available footprint and access requirements of the project.

Suspended access
Hanging scaffolding
Hanging scaffolding is used where ground-based access is not practical, especially beneath bridges, elevated structures, overhangs, undercrofts and difficult-to-reach working areas.
Because the system is suspended from the structure above, it allows safe access in locations where obstructions, traffic routes, water, plant or restricted ground conditions prevent a conventional build from below.
Each arrangement is planned around the structure, loadings and access route required for the work.

Structural support
Bracing frames TG 60
TG 60 bracing frames are used for heavy-duty temporary support applications on bridge, infrastructure and structural projects.
They help provide temporary stability and support during construction, repair, strengthening and staged works where high-load capacity systems are required.
The frame arrangement can be configured around the geometry, loading pattern and sequence of the project.

Waste management
Down caster systems
Down caster systems provide a controlled route for removing waste and debris from upper levels down to designated skip or collection areas.
This improves housekeeping, reduces manual carrying of waste materials and supports safer site operation during demolition, strip-out, construction and refurbishment works.
Installations can be arranged to suit the building layout, number of working levels and expected waste volumes.

Site security
Temporary fences
Temporary fencing helps secure the site perimeter, control access points and protect the public from live construction areas.
Depending on the project, this can include standard mesh fencing, solid hoarding, anti-climb options, gated entrances and pedestrian segregation.
Systems are supplied to match the layout, duration and security level required for the job.

Access systems
Temporary access systems
Temporary access systems provide safe movement for workers, visitors and materials through and around live construction environments.
This can include temporary stair towers, ramps, access platforms, covered walkways and segregated routes designed around the flow of the site.
Each arrangement should reflect the site layout, public protection requirements and day-to-day operational needs of the project.
Need specialist access or temporary works?
Send us your project details, site constraints and programme requirements. We will review the scope and recommend the right solution for safe, practical delivery on site.