South Clyde Energy Plant
DELIVERED PACKAGE
South Clyde Energy Plant
Thermal Insulation Engineers supplied to support delivery on a major energy-from-waste project in Glasgow, with our package completed on site.
ITCC
289-337 Bogmoor Rd, Glasgow G51 4SJ
Thermal Insulation Engineers
Our package completed

Project overview
Energy-from-waste facility
The South Clyde Energy Centre is a large-scale energy-from-waste facility located in the Shieldhall area of Glasgow. The plant processes residual waste to generate electricity and heat, forming part of Scotland’s strategy to reduce landfill and increase energy recovery from waste.
Topp Still Services supplied Thermal Insulation Engineers to support works on the project, providing specialist labour that integrated into the wider site programme and operational requirements.

Our role
Thermal insulation labour supply
We supplied Thermal Insulation Engineers who worked alongside the main contractor to support insulation works across the plant. Our personnel were deployed to meet programme requirements while working within site procedures, safety standards and coordination processes.
- Thermal Insulation Engineers supplied to the project
- Integrated into the main contractor’s site operations
- Reliable attendance across the delivery period
- Strong site standards and dependable performance

Outcome
Our scope successfully delivered
Topp Still Services completed its labour package on this project, maintaining a consistent and reliable specialist labour presence throughout the delivery period. Our personnel supported programme progression while working effectively within the live project environment.
This package demonstrated our ability to support major industrial programmes with dependable Thermal Insulation Engineers who integrate effectively into complex site operations.